[PROCESS]

OEM Manufacturing Process

5-step process from your mold or design to finished product. Customer-owned molds accepted at Step 1. Full visibility at every factory production stage.

Start Your OEM Project — Send Your Mold or Design

Customer-owned molds accepted. Get a feasibility report and factory quote within 24 hours.

[WORKFLOW]
Step by Step

From Your Mold or Design to Delivery in 45 Days

We produce cordless, wet/dry, and industrial vacuum cleaners using your molds or ours. See our full OEM manufacturing capability for what we accept.

01

Send Your Design or Mold

Day 1

Submit your product design, CAD files, technical drawings, or send your existing mold to our facility. We accept formats including STEP, IGES, SolidWorks, and PDF specifications.

CAD files (STEP, IGES, STL, SolidWorks)
2D technical drawings with dimensions
Product samples or existing molds
Material & finish specifications
02

Engineering Review & DFM

Day 2–3

Our engineering team performs a comprehensive Design for Manufacturability analysis. We assess mold compatibility, material selection, and production feasibility.

Mold feasibility assessment
Material optimization recommendations
Cost estimation & quotation
Production timeline planning
03

Sample Production

Day 4–18

First article samples produced on your tooling. Includes dimensional verification, functional testing, and material certification. Samples shipped for your approval.

T1 sample production (7–15 days)
Full dimensional inspection report
Functional & performance testing
Express shipping to your location
04

Sample Confirmation

Day 19–21

You review the samples, provide feedback, and confirm approval. Any modifications are addressed in T2 samples if needed. Final production specs are locked.

Customer sample review & feedback
Modifications and T2 if required
Final specification lock-off
Production schedule confirmation
05

Mass Production & Delivery

Day 22–45

Full-scale production with IQC/PQC/OQC quality gates. Real-time production updates. Products packaged per your specifications and delivered to your designated port.

Full IQC/PQC/OQC inspection
Custom packaging & labeling
Container loading supervision
FOB/CIF shipping arrangement
Engineering blueprints and technical review
[START_NOW]

Ready to Begin?

Send us your design files and get a detailed feasibility report with pricing within 24 hours.

Send Your Design Now
[RFQ_NOW]

Ready to Start Manufacturing?

Send us your design, CAD files, or product specs. Get a detailed factory quote within 24 hours.